After successfully completing stage 1 in 2017 with Frigtech we were again engaged to assist with the completion of Stage 2. The new cool rooms measure 72×35 and is doubling the existing foot print. Western Power installed two new HV transformers, MECS a new SMSB and new 1200 amp cabling to the new chiller, 500 amp to the new DB and new cabling to the existing DB, Generator and chiller. Resource Data Management (RDM) provided the state of the art control system to control the cool rooms and the new Chiller.