MECS Electrical & Controls

Innovative, Reliable, & Tailored Solutions

BAI Bickley HVAC Upgrade

Scope of Work

The project entailed a comprehensive upgrade of the Heating, Ventilation, and Air Conditioning (HVAC) system within a critical communications building. A key component of this upgrade was the replacement of the existing Innotech controls with a more advanced Omron Programmable Logic Controller (PLC) system. 

Project Details

BAI Communications operates essential infrastructure that demands high reliability and precision in environmental control to ensure uninterrupted service delivery. The existing HVAC system, managed by Innotech controls, required modernization to enhance performance, energy efficiency, and system responsiveness. 

The decision to transition to an Omron PLC system was driven by its advanced capabilities, including superior processing power, enhanced flexibility, and improved integration potential with other building management systems. This upgrade aimed to provide more precise control over the HVAC operations, thereby optimizing the internal environment of the communications facility. 

 

Execution Strategy: 

Assessment and Planning: A thorough evaluation of the existing HVAC system and control mechanisms was conducted to identify areas for improvement and potential challenges in the upgrade process. Detailed planning sessions were held to develop a strategy that would allow for a seamless transition to the new control system with minimal disruption to ongoing operations. 

Design and Engineering: Customized control solutions were designed to meet the specific requirements of the facility. This involved configuring the Omron PLC to interface effectively with the existing HVAC equipment and developing control algorithms to optimize system performance. 

 

System Integration: The new PLC system was integrated into the existing HVAC infrastructure. This process included: 

Hardware Installation: Setting up the Omron PLC hardware and ensuring proper connectivity with HVAC components. 

Software Configuration: Programming the PLC with control logic tailored to the facility’s operational needs. 

• User Interface Development: Creating intuitive interfaces for facility managers to monitor and control HVAC parameters effectively. 

Testing and Commissioning: Comprehensive testing procedures were implemented to validate the functionality and reliability of the new control system. This included stress testing under various operational scenarios to ensure robustness and stability. 

Training and Handover: Training sessions were conducted for the facility’s operational staff to familiarize them with the new system’s functionalities and maintenance requirements. Detailed documentation was provided to support ongoing system management. 

 

Challenges and Solutions: 

  • Continuous Operation: Given the critical nature of the communications facility, it was imperative to maintain uninterrupted HVAC services during the upgrade. This was achieved through meticulous planning and phased implementation, ensuring that backup systems were in place during critical transition periods. 
  • System Compatibility: Integrating the new PLC with existing HVAC equipment posed challenges due to differences in communication protocols and hardware interfaces. These were addressed by developing custom interface modules and employing protocol converters where necessary. 
  • User Adaptation: Transitioning to a new control system required operational staff to adapt to new interfaces and control methodologies. Comprehensive training programs and user-friendly interface designs facilitated a smooth transition. 

 

Outcome: 

The HVAC upgrade at the BAI Bickley facility was successfully completed, resulting in enhanced environmental control, improved energy efficiency, and increased system reliability. The new Omron PLC system provided more precise and flexible control over HVAC operations, contributing to the overall operational excellence of the communications facility. 

 

Client Feedback: 

BAI Communications expressed satisfaction with the project’s outcome, highlighting the professionalism and technical expertise demonstrated by the MECs Electrical & Controls team. The seamless integration of the new control system and the minimal disruption to operations were particularly appreciated. 

get in touch

Contact MECS today for tailored solutions, expert advice and reliable service -

anywhere anytime.