As part of an upgrade to its sports facilities, Morley Senior High School required a modern and reliable electrical system for its gymnasium. The project aimed to enhance the facility’s electrical capacity, ensure safety compliance, and integrate advanced communication and security systems to support the school’s activities.
Execution Strategy:
Assessment and Planning:
Conducted a thorough assessment of the existing electrical infrastructure and the new gymnasium’s requirements. Developed a detailed project plan outlining the installation process, timelines, and resource allocation to ensure minimal disruption to school operations.
Switchboard Supply and Installation:
Design and Fabrication: Designed a custom distribution switchboard tailored to the gymnasium’s electrical load and future expansion needs.
Installation: Installed the new switchboard, ensuring seamless integration with the school’s existing electrical systems and compliance with relevant safety standards.
Electrical Wiring:
Power Distribution: Installed wiring to distribute power efficiently throughout the gymnasium, accommodating lighting, HVAC systems, and other electrical equipment.
Lighting Systems: Implemented energy-efficient lighting solutions to provide optimal illumination for various sports and school events.
Communications and Security Systems:
Communications: Installed communication lines to support internet connectivity, public address systems, and other essential services within the gymnasium.
Security: Integrated advanced security systems, including surveillance cameras and access control mechanisms, to ensure the safety of students and staff.
Underground Services Installation:
Infrastructure Connectivity: Laid underground cabling to connect the new gymnasium with existing school buildings, ensuring cohesive integration of electrical, communication, and security systems across the campus.
Testing and Commissioning:
System Testing: Conducted comprehensive testing of all installed systems to verify performance, safety, and compliance with design specifications.
Commissioning: Brought the systems into operational status, ensuring readiness for use by the school community.
Training and Handover:
Staff Training: Provided training sessions for school maintenance personnel on operating and maintaining the new electrical and security systems.
Documentation: Supplied detailed manuals and as-built drawings to support ongoing maintenance and future upgrades.
Challenges and Solutions:
- Minimizing Disruption:
Coordinated closely with school administrators to schedule work during periods that minimized disruption to educational activities, including after-school hours and school holidays.
- Safety Compliance:
Ensured all installations met stringent safety standards, conducting regular inspections and adhering to best practices to guarantee a safe environment for students and staff.
- System Integration:
Facilitated seamless integration of new systems with existing infrastructure through careful planning and the use of compatible technologies, ensuring cohesive operation across the campus.
Outcome:
The electrical upgrade of Morley Senior High School’s gymnasium was completed successfully, resulting in a modernized facility equipped with reliable power distribution, advanced communication capabilities, and robust security systems. The project enhanced the functionality and safety of the gymnasium, supporting the school’s commitment to providing high-quality facilities for its students.
Client Feedback:
Morley Senior High School expressed satisfaction with the professionalism and efficiency demonstrated by the MECS Electrical & Controls team. The seamless execution of the project and the quality of the installations were particularly appreciated.


