BMS Control Panel Design and Manufacture A dedicated BMS control panel was designed and manufactured in house to suit ALS operational requirements. The bright orange panel provides clear identification, clean internal layout and allowance for future expansion. Components, wiring and terminations were selected and assembled to meet...

We were engaged direct by Coles to be the Principal Contractor on site and engage sub coontractors for building works. Our scope included all new switchboards to replace the various switchboards spread all over the store. We installed into an existing room which was to...

MECS Electrical & Controls was contracted to supply and install a new distribution switchboard for the existing gymnasium at Morley Senior High School. The project encompassed comprehensive electrical wiring for the new gym, including communications, security systems, and the installation of underground services to connect...

MECS Electrical & Controls was engaged to perform a comprehensive electrical upgrade at the Coles Bunbury store. The project encompassed the installation of new light and power distribution boards, a 1000-amp mains supply, a smoke spill fan control cubicle, and the relocation of the existing...

MECS Electrical & Controls undertook multiple refurbishment projects for Officeworks stores throughout Western Australia. The scope of work included the installation of new LED lighting systems, relocation of data and power services to checkout areas, and modifications to switchboards to accommodate updated store layouts....

MECS Electrical & Controls was contracted to perform a comprehensive electrical installation for the new Vintage Cellars premises in Mosman Park. The scope encompassed a full light and power installation, including the supply and installation of a Coles-specified switchboard. The project was characterized by a...

Gourmania Chef, a producer of bulk, ready-to-eat meals, embarked on an expansion requiring the construction of a custom-designed facility. MECS Electrical & Controls was involved from the project’s inception, assisting with the design and implementation of the refrigeration control system and managing the mechanical electrical...

MECS Electrical & Controls was engaged by Newbrook Construction to perform comprehensive electrical modifications at the Coles Swanview store. The scope included installing new lighting systems, providing power to preparation areas, and supplying mains power to the new Mechanical Services Switchboard (MSSB). Additionally, MECS negotiated...

Fruitico Grape Farm, a prominent grape producer in Western Australia, undertook a significant expansion to double its existing footprint. The new cool rooms, measuring 72 by 35 meters, were central to this expansion, necessitating substantial upgrades to the farm’s electrical and refrigeration infrastructure. MECS Electrical &...

This project involved a comprehensive upgrade of the existing fluorescent lighting system to an energy-efficient LED solution throughout the IGA Taylor Rd store. The scope included designing a lighting layout to achieve optimal illumination levels, selecting appropriate LED fittings, and managing the installation process to...