Execution Strategy:
Installation and Integration
- Installed the BACnet controller and configured it to synchronise with the PPAC unit.
- Integrated the Fusion Wall controller and sensors to provide an intuitive interface for staff.
- Ensured the system complied with industry standards and energy efficiency requirements.
Testing and Optimisation
- Conducted a full system check to confirm accurate climate control settings.
- Fine-tuned the controls to balance temperature, humidity, and air circulation.
- Verified the user interface functionality for ease of operation.
Project Challenges and Solutions
Maintaining Precise Environmental Conditions
- Customised the system’s settings to prevent condensation and ensure air quality in the pool area, as well as monitoring the pool temperature to ensure the air temp is +/- 3°C to the water temp.
Seamless System Integration
- Ensured the new controls worked efficiently with existing infrastructure without disrupting other building operations.
Energy Efficiency and Compliance
- Adjusted automation settings to reduce energy consumption while maintaining optimal climate conditions.
Client Response
Brabham Primary School was pleased with the functionality, ease of use, and energy efficiency of the system. The MECS team was recognised for their professional execution and attention to detail throughout the project.
For more information about our projects, visit: MECS Group Projects