Controls System Replacement
Replace ageing control gear with updated controls equipment to improve reliability and ongoing supportability. The upgrade was delivered in a way that kept refrigeration and associated mechanical systems operating.
New Automation Hardware and Panel Rework
Install new automation hardware and rework existing panel layouts to improve clarity and serviceability. The finished setup was organised, clearly arranged, and built for more dependable day-to-day operation.
Staged Cutover, Testing, and Commissioning
Plan and execute each changeover step-by-step to avoid downtime. Each stage was checked and tested before moving to the next, keeping the site online while the controls upgrade was completed.
Project Challenges and Solutions
Maintaining Refrigeration with Zero Downtime
Refrigeration was required to remain online throughout. The team staged cutovers carefully and verified each stage before proceeding to keep systems running continuously.
Working within Live Airport Catering Operations
The facility needed to stay productive while works progressed. Strong communication, coordination, and tidy work practices kept the upgrade on track without disrupting operations.
Client Response
The client was relieved the refrigeration and mechanical systems stayed online throughout, with no interruption to catering output. They also appreciated the cleaner panel layout and the improved visibility and control the upgraded system provides for daily operations.