MECS Electrical & Controls

Innovative, Reliable, & Tailored Solutions

 

Archive

We rolled into Westralia Square’s underground car park before dawn, headlights throwing long shadows across concrete pillars still slick from an overnight drizzle. Four of us made up the Saturday roster, but titles and individual jobs mattered less than the shared mission: remove an ageing control...

We delivered the complete electrical and controls package for Inghams’ new ammonia‑based cold‑storage facility, including four motor‑control centres (MCCs), an Allen Bradley control architecture, and high‑efficiency variable‑speed drives across the refrigeration plant....

Our team supplied, installed and commissioned a six‑part process skid to boost fluid‑handling capacity at a remote processing hub near Exmouth. The modular assemblies were prefabricated, tested and packed‑down in Perth before being transported 1,400 km north for final integration and start‑up....

MECS Electrical & Controls supplied and commissioned an ABB control system for the PPAC (Pool Packaged Air Conditioning) unit at Brabham Primary School’s new indoor pool. The system was designed to provide precise climate management, ensuring optimal air quality and temperature control. The installation included...

MECS Electrical & Controls was engaged by a refrigeration contractor to upgrade the existing refrigeration control system at Costa Logistics’ cold storage facility. The project involved removing the outdated Allen Bradley Programmable Logic Controller (PLC) and installing a new Danfoss system to manage two refrigeration...

This project involved the in-house manufacturing of a switchboard designed to manage power distribution and integrate Siemens controls. The system was engineered to monitor and regulate water flow via Variable Speed Drives (VSDs) and establish a high-level interface with the Programmable Logic Controllers (PLCs) in...

The project encompassed comprehensive mechanical electrical wiring for the Chichester Park Pavilion. This included the supply, installation, and commissioning of a Siemens Building Management System (BMS) to optimize the facility’s mechanical operations....

The project entailed a comprehensive upgrade of the Heating, Ventilation, and Air Conditioning (HVAC) system within a critical communications building. A key component of this upgrade was the replacement of the existing Innotech controls with a more advanced Omron Programmable Logic Controller (PLC) system....