Gourmania Chef Bayswater

Gourmania Chef are a company producing bulk, ready to eat meals and due to their expansion required a new custom designed facility to be built. MECS were involved from the beginning helping with the design of the refrigeration control system as well as the mechanical electrical for the office fit out.

The site consisted of cool rooms, freezer rooms and a plate freezer, all up three racks were required all having three compressors each. The Danfoss system monitors all the plant and can be accessed by the refrigeration company and the owner anywhere, any time.

Costco Wholesale Perth Airport

Perth Airport is the first of the two planned Costco sites for W.A. MECS, along with specialised tradesmen from around Australia were trusted to install an award winning refrigeration plant consisting of both CO2 and Ammonia refrigerants.

The project was completed in record time and to the highest of standards meaning when the commissioning team arrived from Sydney they too could complete their works in record time.

Vintage Cellars Mosman Park

We completed a full light and power installation including Coles Specified switchboard to the new premises. This project had a tight timeline and we a re proud to say me met all projected targets.

Costa Logistics

Costa Logistics is the cold store delivering fruit and vegetables to all Coles stores in WA. MECS was engaged by a refrigeration contractor to remove the out dated Allen Bradley PLC and install and new Danfoss system to control the two refrigeration racks and the existing and new cool rooms installed.

Farmer Jacks Ashby

Design and install a refrigeration system including glass door freezer, cool rooms and freezer rooms. The system was controlled by the Emerson Site Supervisor and can be monitored by management anywhere anytime.

JD Sports Carousel

MECS was engaged by the multi-national company Gibson Shopfitters to install specified lighting similar to that used throughout the world. The SOW of also included the general power, switchboard upgrade and supply and installation of communications cabling and rack.

Woolworths Albany

Wiring of new glass door freezers and new remote condensers all while Woolworths continued trading. The project was an intense 5 weeks with day, night and weekend works.

Morley Senior High School

Supply and installation of a new Distribution Switchboard to the existing gym. Wiring of the new gym including communications, security, underground services between the new building and the existing infrastructure.

Officeworks

MECS have completed many refurbishments to Officeworks stores throughout WA. Scope includes new LED lighting, relocation of data and power services to checkouts and switchboard modifications to suit the new layouts.

Joondalup Courthouse

Working for a builder we were engaged to install new lighting, power and CCTV to expanded foyer area. Crucial shutdowns were carried out over weekends so as the court was not affected.