MECS Electrical & Controls

Innovative, Reliable, & Tailored Solutions

 

Archive

Fruitico Grape Farm, a prominent grape producer in Western Australia, undertook a significant expansion to double its existing footprint. The new cool rooms, measuring 72 by 35 meters, were central to this expansion, necessitating substantial upgrades to the farm’s electrical and refrigeration infrastructure. MECS Electrical &...

This project involved the in-house manufacturing of a switchboard designed to manage power distribution and integrate Siemens controls. The system was engineered to monitor and regulate water flow via Variable Speed Drives (VSDs) and establish a high-level interface with the Programmable Logic Controllers (PLCs) in...

This project involved a comprehensive upgrade of the existing fluorescent lighting system to an energy-efficient LED solution throughout the IGA Taylor Rd store. The scope included designing a lighting layout to achieve optimal illumination levels, selecting appropriate LED fittings, and managing the installation process to...

This project involved a comprehensive upgrade of the Heating, Ventilation, and Air Conditioning (HVAC) system at the Coles Inglewood store. The scope included modifying existing Emerson controls, upgrading two Mechanical Services Switchboards (MSSBs), and installing new equipment such as pumps, fans, Air Handling Units (AHUs),...

The project involved the installation of a cost-effective and open protocol control system to manage the Heating, Ventilation, and Air Conditioning (HVAC) systems at Malvern Springs Primary School. The primary objective was to enhance the learning environment by ensuring optimal indoor air quality and temperature...

The project involved comprehensive mechanical electrical wiring and the implementation of a proprietary central control system for the Brightwater Inglewood facility. The objective was to enhance the operational efficiency and reliability of the facility’s mechanical systems, ensuring optimal comfort and safety for residents and staff....

The project encompassed comprehensive mechanical electrical wiring for the Chichester Park Pavilion. This included the supply, installation, and commissioning of a Siemens Building Management System (BMS) to optimize the facility’s mechanical operations....

The DMJC project involved the comprehensive replacement of both Mechanical Services Switchboards (MSSBs) within an operational facility. A critical requirement was to execute the replacements without causing any downtime to the building’s users, ensuring uninterrupted operations throughout the process....

The project entailed a comprehensive upgrade of the Heating, Ventilation, and Air Conditioning (HVAC) system within a critical communications building. A key component of this upgrade was the replacement of the existing Innotech controls with a more advanced Omron Programmable Logic Controller (PLC) system....